Leave a request

Technologies and solutions for sustainable development of electric power industry

Implementation of energy efficient and energy saving projects using the latest and innovative methods, technologies and equipment

About the company

The main direction of the company is project sales. The company also supplies equipment for the energy industry. The company’s activities are aimed at introducing the latest technologies to save electricity in the production and transit of electricity in networks

LLC Time-Energy is a team of educated, energetic professionals. We are united by the goal of making money from the savings from the latest technology. We earn with our own intellectual decisions, our own experience and our own hands. We like to keep up with the times and offer our customers something that saves them financial and energy resources, thereby reducing the cost of their products or services and reducing their impact on the environment.

1000

year of foundation of the company

0

companies are our partners

0

areas of activity

SERVICES

PRIORITY DIRECTIONS OF ACTIVITY

THE COMPANY DEVELOPS AREAS

Technologies and solutions for TSO’s and DSO’s SAIDI and SAIFI rates improvement.

Waste disposal by Dimethylether (DME) and methanol manufacture technologies.

Energy efficiency and energy saving for enterprises - small and large, trade and production, agricultural and processing, mining, concentrating and metallurgy.

HOW WE WORK

All our projects, regardless of the complexity and workload, we implement according to the only worked out scheme: preliminary analysis – object survey - haggling - implementation - performance monitoring.

Preliminary analysis allows to avoid the loss of our most valuable and non-renewable resource - time. At this stage, we receive from you all possible information about the object and make a preliminary conclusion about the feasibility of the project from both technical and economic point of view. In case of a positive conclusion, we agree the acceptable payback period of the project, the preliminary format and the terms of the object survey.

Survey – in addition to measurements, inspection and study of the object as themselves, at this stage are agreed:

  • types and manufacturers of used equipment (yes, we’ve got our own suppliers and partners and first of all we offer their products, but this not a dogma and we can discuss the use of any other manufacturer), circuit solutions, logistics, approximate implementation times;
  • project implementation options: turnkey, enterprise by their own, with the involvement of local staff on a paid basis, with the involvement of local contractors and installators;
  • format and type of required documentation: pre-project solution, project, certification etc.;
  • sources of project financing: own funds of the enterprise, ESCO contract, credit, factoring or other.

Haggling – we are not the cheapest ones. There will always be someone cheaper, and maybe much cheaper, and maybe someone will do the same (almost) and for free (almost). Competence in technical solutions, guaranteed efficiency, reliability, safety for operational and maintenance personnel, convenience and minimal operating costs - these are what you pay for. Are you ready to give up any of the above? We don’t, but we can haggling within our earnings (but not too much, so you’ve read about our company, don’t you?).

Implementation – well, everything is clear in this. Well, who with all the technical information, project documentation, professional staff and high-quality specialists will not meet agreed deadlines and estimates? (or will not agree new)

Performance control – for most companies on a market it’s one of the most difficult and conflicting issues in the implementation of any energy-saving and efficient projects. Some do not pay attention to it at all; some just declare some numbers; some make calculations, but very few companies can guarantee the effectiveness of their solutions. Therefore, it’s one matter to declare the economy level, but definitely another - daily and monthly prove it throughout the whole payback period by the transparent and clear understandable tools. Just like our company develops and provides to our clients.

With our monitoring, you can not only monitor the effectiveness of implemented solutions, but also control the status and basic operating parameters of your equipment and power network from anywhere with internet access.

WHAT WE OFFER

Cost optimization

We offer various solutions to problems that will help save your money, distribute the desired budget to the most important production departments.

Project work

We start our work with the analysis of your company and project preparation. We are ready to inspect the object, collect initial data and make the necessary measurements

Equipment

In their work, experts use modern German analyzers, which measure the required parameters of efficient operation with high accuracy.

Innovation

We work to implement modern solutions necessary for your tasks. Only an innovative approach to solving problems will give the most economical and effective result.

OUR PROJECTS

Personal innovative approach to solving the tasks at your company

01

High voltage reactive power compensation

TIME Energy together with its partners has implemented the Reactive Power Compensation Project.

The company has carried out a full range of works from the inspection of the object, development of technical solutions, development of design documentation with expertise and commissioning of high-voltage equipment. The on-line system for monitoring the operation of compensation devices has been set up. The completed project allowed the Metallurgical Plant to save about 4.5 million UAH. for a year. Comprehensive warranty on the project product in general from our company – 5 years

02

Low voltage reactive power compensation

At the request of the Epicenter-Agro campaign, which specializes in agriculture, our company Time Energy conducted a survey of the finished new Elevator project. We made changes to the main working project, adjusted the capacity based on the analysis of networks and measurements. Four new units with a total capacity of 1.2 MVAr were manufactured and connected in a short time. The planned cos ɸ is maintained »

03

Granite quarry, installation of the Frequency Converter

The team of specialists of Time Energy LLC together with the team of experts of Danfoss Ukraine completed a “turnkey” project to implement Frequency-Controlled Converters to control the technological process of granite processing in one of the granite quarries of Zhytomyr region

04

Survey of photovoltaic power plant 9.96 MW

On the order of the SOLAR QUANT ENERGY Company, we have a 9.96 MW photovoltaic power plant in the Dnepropetrovsk region, Sinelnikovsky district. The customer could not determine the causes of overheating on the copper conductors of the low-voltage side of the transformer in TP-35. The calculated data and project documentation stated that the current load is appropriate and there is a margin. The reason has been established, a report with the results of measurements and conclusions has been sent to the customer. The customer took the decision to implement our recommendations.

05

Survey of Ternivska-2 Substation of Krivoy Rog Iron Ore Plant

Time Energy received a request and surveyed the Ternovskaya-2 substation of the Krivoy Rog Iron Ore Plant (KRZhK), Krivoy Rog. It turned out that the existing equipment for Reactive Power Compensation burned out, damaging part of the substation equipment. The measurements and examination made it possible to establish the cause of the failure of the incorrectly designed equipment. The customer received a report with the results of measurements and recommendations on the design of new installations, their location, capacities and protections. Having such a report in hand, he can purchase new equipment that will not let you down and will last for many years, saving significant financial resources.

06

6kV Reactive Power Compensation at DMK

Time Energy completed a project to introduce 6 kV Reactive Power Compensation devices at the Dneprovsky Metallurgical Plant (now KametStal) on the second stage. According to the results of the inspection of the energy facilities of the enterprise and the results of the tender, we have developed, manufactured, assembled, connected and put into operation three Units with a total capacity of 6 MVAr at a voltage of 6 kV. The settings are working normally. The monitoring program we installed together with the KRM demonstrates the declared savings.

07

Reconstruction of UKRM Shopping Center "Epicenter", Khmelnitsky

Time Energy Company completed the project of reconstruction of the UKRM in the supply substation of the Shopping Center “Epicenter”, Khmelnitsky. The existing UKRM, manufactured 4 years ago by a third-party organization, failed or did not work correctly. The task of keeping cos µ was not fulfilled, the company received bills for reactive energy. We have analyzed, amended and completely replaced the contents of the UKRM. At the moment, UKRM work in night / day mode.

08

Reconstruction and commissioning of a three-stage adjustable UKRM

TIME ENERGY carried out a complete reconstruction of the previously failed stepwise Reactive Power Compensation Unit 6кV. Measurements were taken and the cause of failure was determined. The company has developed a Reconstruction project with the replacement of the main switching devices and protection circuits. The operation of control devices has been debugged, the microprocessor protection device of the input cell has been replaced. The practically new unit was put into operation in February 23 and meets the declared requirements for savings and technical parameters.

09

A turnkey project with the Installation of a Variable Frequency Drive with Automation of the control system for the feed pumps of the water-bearing station of the CDPU (Central Deaerated Feeding Unit) of the TPP PrJSC "KAMET-STEEL" workshop

During 2023, the Time-Energy company implemented a turnkey project with the Installation of a Variable Frequency Drive with Automation of the control system for the feed pumps of the water-bearing station of the CDPU (Central Deaerated Feeding Unit) of the TPP PrJSC “KAMET-STEEL” workshop.

The project was implemented on the basis of a Danfoss Variable Frequency Drive; a Du/Dt output filter was used to protect the engine. A completely new Automated Control system, integrated with the Monitoring system, which allows you to carry out all switching from the operator’s workstation and receive data on the operation of the system in “on-line” mode. The project saved about 45% of electricity and about 12% of steam. Reducing the pressure in the system and stopping the reverse water circulation made it possible to carry out planned repairs and save existing lines.

10

Supplied transformer bushings with polymer insulation 220 kV

Time-Energy LLC has supplied transformer bushings with polymer insulation 220 kV for JSC ZahidEnergo Burshtyn TPP and 362 kV bushings of the German production GRIDINSPECT GmbH for Dobrotvirskaya TPP.

The contract was completed within the specified time frame, despite the problems at the Polish border. The equipment was delivered in full, according to the technical specifications, installed and functioning without any comments.

11

Control system for five 6 kV dredgers with a capacity of 3 MW each at the PNS of the Central Mining and Processing Plant Metinvest, based on the HICONICS HIVERT 3.4 MW Medium Voltage Frequency-Adjustable Converter

The company OOO TIME-ENERGY has completed a turnkey project and successfully commissioned a control system for five 6 kV dredgers with a capacity of 3 MW each at the PNS of the Central Mining and Processing Plant Metinvest, based on the HICONICS HIVERT 3.4 MW Medium Voltage Frequency-Adjustable Converter. Together with partners OOO Enext, OOO AVM-Amper and RelSIS, a complex process control scheme, monitoring and remote notification of accidents was implemented. A lot of work was done to build a separate climate control room for RU-6, PCSN and APCS.
The savings from the implementation amount to about 18% of the base consumption. Technically, the Pulp Pumping Station of the Central Mining and Processing Plant received the ability to control five more dredgers and is ready to perform tasks to reduce Specific Consumption for any incoming volumes of pulp.

COOPERATION

Our partners and suppliers

APPLICATION FOR ENERGY SURVEY

Leave your request for a consultation and we will contact you for a discussion



    CONTACTS

    how can you contact us

    Kyiv, street Yevhen Sverstyuk, bldg. 21, of. 606

    Company address

    Thanks!

    Your application is accepted

    We will call you soon

    Go back