01
High voltage reactive power compensation
TIME Energy together with its partners has implemented the Reactive Power Compensation Project.
The company has carried out a full range of works from the inspection of the object, development of technical solutions, development of design documentation with expertise and commissioning of high-voltage equipment. The on-line system for monitoring the operation of compensation devices has been set up. The completed project allowed the Metallurgical Plant to save about 4.5 million UAH. for a year. Comprehensive warranty on the project product in general from our company – 5 years
02
Low voltage reactive power compensation
At the request of the Epicenter-Agro campaign, which specializes in agriculture, our company Time Energy conducted a survey of the finished new Elevator project. We made changes to the main working project, adjusted the capacity based on the analysis of networks and measurements. Four new units with a total capacity of 1.2 MVAr were manufactured and connected in a short time. The planned cos ɸ is maintained »
03
Granite quarry, installation of the Frequency Converter
The team of specialists of Time Energy LLC together with the team of experts of Danfoss Ukraine completed a “turnkey” project to implement Frequency-Controlled Converters to control the technological process of granite processing in one of the granite quarries of Zhytomyr region
04
Survey of photovoltaic power plant 9.96 MW
On the order of the SOLAR QUANT ENERGY Company, we have a 9.96 MW photovoltaic power plant in the Dnepropetrovsk region, Sinelnikovsky district. The customer could not determine the causes of overheating on the copper conductors of the low-voltage side of the transformer in TP-35. The calculated data and project documentation stated that the current load is appropriate and there is a margin. The reason has been established, a report with the results of measurements and conclusions has been sent to the customer. The customer took the decision to implement our recommendations.
05
Survey of Ternivska-2 Substation of Krivoy Rog Iron Ore Plant
Time Energy received a request and surveyed the Ternovskaya-2 substation of the Krivoy Rog Iron Ore Plant (KRZhK), Krivoy Rog. It turned out that the existing equipment for Reactive Power Compensation burned out, damaging part of the substation equipment. The measurements and examination made it possible to establish the cause of the failure of the incorrectly designed equipment. The customer received a report with the results of measurements and recommendations on the design of new installations, their location, capacities and protections. Having such a report in hand, he can purchase new equipment that will not let you down and will last for many years, saving significant financial resources.
06
6kV Reactive Power Compensation at DMK
Time Energy completed a project to introduce 6 kV Reactive Power Compensation devices at the Dneprovsky Metallurgical Plant (now KametStal) on the second stage. According to the results of the inspection of the energy facilities of the enterprise and the results of the tender, we have developed, manufactured, assembled, connected and put into operation three Units with a total capacity of 6 MVAr at a voltage of 6 kV. The settings are working normally. The monitoring program we installed together with the KRM demonstrates the declared savings.
07
Reconstruction of UKRM Shopping Center "Epicenter", Khmelnitsky
Time Energy Company completed the project of reconstruction of the UKRM in the supply substation of the Shopping Center “Epicenter”, Khmelnitsky. The existing UKRM, manufactured 4 years ago by a third-party organization, failed or did not work correctly. The task of keeping cos µ was not fulfilled, the company received bills for reactive energy. We have analyzed, amended and completely replaced the contents of the UKRM. At the moment, UKRM work in night / day mode.
08
Reconstruction and commissioning of a three-stage adjustable UKRM
TIME ENERGY carried out a complete reconstruction of the previously failed stepwise Reactive Power Compensation Unit 6кV. Measurements were taken and the cause of failure was determined. The company has developed a Reconstruction project with the replacement of the main switching devices and protection circuits. The operation of control devices has been debugged, the microprocessor protection device of the input cell has been replaced. The practically new unit was put into operation in February 23 and meets the declared requirements for savings and technical parameters.
09
A turnkey project with the Installation of a Variable Frequency Drive with Automation of the control system for the feed pumps of the water-bearing station of the CDPU (Central Deaerated Feeding Unit) of the TPP PrJSC "KAMET-STEEL" workshop
During 2023, the Time-Energy company implemented a turnkey project with the Installation of a Variable Frequency Drive with Automation of the control system for the feed pumps of the water-bearing station of the CDPU (Central Deaerated Feeding Unit) of the TPP PrJSC “KAMET-STEEL” workshop.
The project was implemented on the basis of a Danfoss Variable Frequency Drive; a Du/Dt output filter was used to protect the engine. A completely new Automated Control system, integrated with the Monitoring system, which allows you to carry out all switching from the operator’s workstation and receive data on the operation of the system in “on-line” mode. The project saved about 45% of electricity and about 12% of steam. Reducing the pressure in the system and stopping the reverse water circulation made it possible to carry out planned repairs and save existing lines.
10
Supplied transformer bushings with polymer insulation 220 kV
Time-Energy LLC has supplied transformer bushings with polymer insulation 220 kV for JSC ZahidEnergo Burshtyn TPP and 362 kV bushings of the German production GRIDINSPECT GmbH for Dobrotvirskaya TPP.
The contract was completed within the specified time frame, despite the problems at the Polish border. The equipment was delivered in full, according to the technical specifications, installed and functioning without any comments.
11
Control system for five 6 kV dredgers with a capacity of 3 MW each at the PNS of the Central Mining and Processing Plant Metinvest, based on the HICONICS HIVERT 3.4 MW Medium Voltage Frequency-Adjustable Converter
The company OOO TIME-ENERGY has completed a turnkey project and successfully commissioned a control system for five 6 kV dredgers with a capacity of 3 MW each at the PNS of the Central Mining and Processing Plant Metinvest, based on the HICONICS HIVERT 3.4 MW Medium Voltage Frequency-Adjustable Converter. Together with partners OOO Enext, OOO AVM-Amper and RelSIS, a complex process control scheme, monitoring and remote notification of accidents was implemented. A lot of work was done to build a separate climate control room for RU-6, PCSN and APCS.
The savings from the implementation amount to about 18% of the base consumption. Technically, the Pulp Pumping Station of the Central Mining and Processing Plant received the ability to control five more dredgers and is ready to perform tasks to reduce Specific Consumption for any incoming volumes of pulp.